Sources checked 15 October 2026

    AGL connection fee when you move house

    AGL sells the plan. The poles and wires belong to the distributor for your new address, and you do not choose that company. When you move, AGL asks the distributor to connect the property, and any charge the distributor bills to AGL is passed through on your AGL bill.

    There is no single national AGL connection fee. AGL says a service-order fee can apply for connecting when you move in, and that the amount depends on the network and the work. Until we have copied the figure from AGL's current fee schedule for each network, the amount on this page stays marked as being verified.

    AGL sells residential electricity in NSW, VIC, QLD, SA and the ACT. See AGL plans.

    Compare before you connect

    Connecting with AGL means you start on an AGL plan. Compare what is available at the new address first, then book the connection. It is free, and the move-in is arranged in the same step.

    Compare before you connectWe earn a commission when you switch through us, and our switching partner offers a smaller panel than the plans we track. How we make money

    How to connect with AGL

    1. 1

      Have the full street address, postcode and move-in date of the new place.

    2. 2

      Compare the plan before you book the connection. The retailer who connects you is the retailer who bills you.

    3. 3

      Give AGL at least one business day's notice if you want connection on move-in day, and leave the meter accessible with the main switch off.

    4. 4

      Tell your old retailer your move-out date so the old address is not left in your name. If anyone at the new home uses life support equipment, tell AGL before you move.

    AGL connection fee

    AGL's fees page says a fee may apply for connecting when you move in, including reconnection, and that distributor or meter-coordinator charges are passed through. Remote connections are charged at the amount in AGL's fee schedules. AGL does not publish one dollar figure that covers every address.

    Connection fee: Being verified

    Source: AGL fees and charges and AGL moving house. As at 15 October 2026. We will replace “Being verified” only when the figure is copied from that schedule.

    How long AGL says it takes

    On its moving-house page, AGL says that with one business day's notice, clear and safe meter access, and the site safety requirements met, it will connect electricity on the day you move in. That is AGL's published notice period, not a guarantee from the distributor, and it does not apply to a new build that still needs a meter.

    Source: AGL moving house. As at 15 October 2026.

    Frequently asked questions

    • Does AGL charge a connection fee when you move house?

      AGL says a fee may apply for connecting when you move in, and that distributor charges are passed through on the bill. AGL does not publish one national dollar amount. The figure for your address is being verified against AGL's current fee schedule.

    • How much notice does AGL need to connect electricity?

      AGL's moving-house page says one business day's notice, with clear and safe meter access, for connection on the day you move in. A new build or a meter upgrade is a different job and takes longer. Checked 15 October 2026.

    • Can I compare other retailers before I connect with AGL?

      Yes. In NSW, VIC, QLD, SA and the ACT you can choose the retailer who connects the new address. Comparing first means you are not placed on a default offer on day one.